Track and siding work at Rollinsford Junction
The rail line still runs through Rollinsford and splits at the junction, and tie, ballast and crossing work along it is done in short possessions with a crew working out of a truck. A Rollinsford track placement goes at the nearest grade crossing on the road side, because nothing is allowed to stand inside the Rollinsford right of way while trains are running.
Those Rollinsford possessions are short, so the rental is measured in days rather than months. Crossing surface renewals in Rollinsford shut a road for a day and the unit moves with the crew to the next one.
Border traffic and Rollinsford house jobs
Rollinsford empties every morning across the bridge and down the river road, which means contractors here often work with nobody home. A Rollinsford renovation keeps its unit where the service truck can reach it from the street, and Rollinsford owners leave the placement arranged rather than meeting us on site.
Winter parking bans on the narrow Rollinsford streets shape those placements from December through March. Rollinsford contractors therefore pull units off the street before the first storm.
Hayfields, gravel and back roads in Rollinsford
Behind the village the Rollinsford land opens into hayfield and old pasture running up to the Somersworth line. Barn, drainage and fence work in Rollinsford takes a unit at the field gate on hardpack, and a Rollinsford crew will not drive a loaded truck across grass that has not been cut.
Rollinsford gravel drives soften badly in April, so we hold those deliveries until the frost is fully out. Summer is the working season on the Rollinsford back roads. Rollinsford orchard and hayfield owners book the same weeks each year for that work.
