Ice-out and camp openings in Northwood
The camps around the Northwood lake and ponds are reached by private roads that go soft as soon as the frost starts moving. A Northwood camp order waits for the road to firm and then the unit goes at the head of the lane, because a Northwood camp road rarely has anywhere for a loaded truck to turn around.
Opening work in Northwood is dock, deck and septic crews all crowding into May. Northwood road associations frequently order for several camps together. Northwood owners on the same lane usually agree one placement between them.
Shoreline rules and pond work in Northwood
Shoreland protection covers the ground around every Northwood pond, and it applies to where equipment and facilities stand as much as to the structure being built. A Northwood placement near water goes on upland outside the protected strip, and Northwood contractors usually have that written into the permit before work begins.
Dam, outlet and boat ramp repairs in Northwood are done at low water in late summer. Those Northwood rentals are short and fixed to the work window. Northwood ramp repairs in particular are finished before the fishing season opens up.
Frozen ground and Northwood timber work
Most of the Northwood woodlot cutting happens once the ground is hard enough for a loaded truck, which usually means from December into March. A Northwood landing takes one unit at the turnaround on hardpack, and a Northwood skid road is no use to a service vehicle at any point in the year.
Mud season in Northwood closes the gravel roads and ends the season abruptly. Northwood operators plan the cut to finish before the posting goes up. Northwood landowners generally schedule the next cut for the following December.
